112' DIESEL TANK | POWER PLANT
A power generation facility relied on a single 112-foot diameter diesel tank to supply backup generators. With no secondary storage available, taking the tank out of service for a conventional API 653 inspection would have required alternate storage to be brought in, making it a costly and lengthy endeavour.
Case Studies
150' #2 FUEL OIL TANK | POWER PLANT
A power plant client required an on-stream API 653 inspection of a 150-foot diameter red-dyed #2 fuel oil tank. Initial concerns included potential sediment build-up that could interfere with robotic inspection, and a lack of crane access around the tank perimeter.
Case Studies
30' DIESEL TANK | POWER PLANT
A cogeneration power plant relied on a 30-foot diameter diesel tank to supply fuel for its turbines. A full API 653 out-of-service inspection would have required temporary storage equipment, taken the tank offline, and forced the manufacturing plant that the facility powered to shut down temporarily as well.
Case Studies
99' DIESEL TANK | POWER PLANT
A California power plant turned to Square Robot for its API 653 compliant inspection of its 99-foot internal floating roof diesel tank, relying on the team's expertise for roof entry through a new manway.