150' GASOLINE | REFINERY - SIDE LAUNCH
This refinery had completed an RBI on this tank which only extended the inspection interval by 2 years. They wanted a more thorough inspection with high density data to understand the true condition of the tank, but also had timeline constraints for the inspection.
Case Studies
217' JET A1 TANK | REFINERY
A critical jet fuel tank at a major refinery could not come offline without significant operational impact to the terminal. The client had a strict 5-day window to complete a full API 653 inspection of the 217-foot diameter tank, a challenging constraint for any conventional approach.
Case Studies
70' LUBE OIL TANK | REFINERY
A Texas refinery operated a 70-foot diameter lube oil tank that was subject to heightened quality control and assurance standards. Taking the tank out of service for a conventional API 653 inspection would have been extremely disruptive to production operations and costly to manage.
Case Studies
40' MGO DIESEL TANK | REFINERY — SIDE LAUNCH
A Singapore refinery had several tanks scheduled for robotic inspection to avoid the significant operational disruption that out-of-service inspections would have caused. For this 40-foot MGO diesel tank, Square Robot worked jointly with their local regional partner to deliver the inspection.